Oman Drydock Company (ODC)

2009-2014


Installed and configured 30+ high end Network Switches in different locations ODC buildings in Duqum. configured
all the edge switches with redundant Core switches on Main location. Project also included the structured cabling
of 1500+ points and 12 fiber terminations. We also supplied many desktops, laptops, servers and other IT accessories. Recently we are shortlisted for 2014-15 maintenance contract of Servers and Storages.